ExamShortcut

Time & Work

Log in to track
high importance~1 Q in Tier 122 formulas⚑ 15 shortcuts5 subtopics

Practice one subtopic at a time

Each subtopic has its own practice sets of 10, next to its notes and question types.

Full topic test β€” all 61 questions

Two modes: Practice reveals the explanation after each question; Test uses a per-question time budget like the real exam and saves your score.

Topic test Β· 61 questions

Suggested time 40 min Β· wrong answers go to your mistake notebook automatically.

What this Time & Work test covers

This is the full Quant topic set for Time & Work: 61 questions spread over 5 subtopics (Efficiency, 'Twice as Good' & Ratio Cases: 13, Work Rates & the LCM Method: 12, Pipes & Cisterns: 12 and Men–Days–Hours Chain & Provisions: 12, plus 1 more). The difficulty mix is 20 easy, 31 medium and 10 hard. The timed test budgets about 40 minutes in total, using a per-question allowance that runs from 25 to 60 seconds depending on the question. 26 of the 61 questions also come with a faster exam-style route in addition to the full solution.

In the syllabus data on this site Time & Work is rated high importance, with about 1 question in a Tier 1 paper and about 2 in Tier 2. The questions here are written in the style of the recurring previous-year patterns for this topic, with fresh numbers and wording.

Question types in this set

The set is built from 34 recurring question types. The ones below appear most often here; each links to the lesson where the method is taught.

  • 'k times as efficient', together time given

    3 questionsvery common

    How to spot it: 'A is twice/thrice as efficient as B and together they finish in T days' β€” the individual times are asked.

    Example from this set: A is twice as efficient as B, and together they complete a work in 18 days. B alone can complete it in:

    Learn this in β€œEfficiency, 'Twice as Good' & Ratio Cases” β†’

  • Efficiency ratio given as a : b

    3 questionscommon

    How to spot it: An explicit ratio like 3 : 2 is given for the efficiencies, with either the together time or one person's time.

    Example from this set: The efficiencies of A and B are in the ratio 3 : 2, and together they finish a work in 15 days. B alone will finish it in:

    Learn this in β€œEfficiency, 'Twice as Good' & Ratio Cases” β†’

  • Efficiency ratio plus a gap of days

    3 questionscommon

    How to spot it: 'A is twice as fast as B and takes 12 days less' β€” find either individual time or the together time.

    Example from this set: A is twice as fast a worker as B and takes 12 days less than B for the same work. Working together, they will finish the work in:

    Learn this in β€œEfficiency, 'Twice as Good' & Ratio Cases” β†’

  • Filling and emptying pipes open together

    3 questionsvery common

    How to spot it: At least one pipe fills and at least one pipe (or a leak) empties, all at the same time.

    Example from this set: A pipe can fill a tank in 12 hours and another pipe can empty the full tank in 24 hours. If both are opened, the empty tank will be filled in:

    Learn this in β€œPipes & Cisterns” β†’

  • Men–days–hours chain

    3 questionsvery common

    How to spot it: One scenario of men, days and (maybe) hours per day is given; a second scenario changes some of them and one value is asked.

    Example from this set: If 18 men can complete a piece of work in 25 days, in how many days will 30 men complete the same work?

    Learn this in β€œMen–Days–Hours Chain & Provisions” β†’

  • Wages split by work done

    3 questionsvery common

    How to spot it: A total wage for a joint job is given; find one person's share β€” sometimes with unequal days worked or an unknown member.

    Example from this set: A and B together receive β‚Ή600 for completing a job. A alone can do the job in 10 days and B alone in 15 days. A's share is:

    Learn this in β€œJoining / Leaving Mid-work, Alternate Days & Wages” β†’

  • combined work

    2 questions

    Example from this set: A completes a job in 10 days and B in 20 days. Working together, they complete it in:

    Learn this in β€œWork Rates & the LCM Method” β†’

  • Two workers together (or the reverse)

    2 questionsvery common

    How to spot it: Two individual times are given and the together time is asked β€” or the together time and one person's time are given and the other person is asked.

    Example from this set: A can complete a piece of work in 15 days and B can complete it in 10 days. Working together, they will complete it in:

    Learn this in β€œWork Rates & the LCM Method” β†’

…plus 26 less frequent types, each covered by one or two questions.

Traps to watch for in Time & Work

These are the slips the lessons flag for this topic, one or two from each subtopic. A quick scan before you start is worth the minute.

  • Work Rates & the LCM Method

    Common slip: Adding the days (12 + 24 = 36) instead of adding the rates.

    Instead: Rates add, days do not. The together time is ab/(a+b), and it must be less than the smaller time.

  • Efficiency, 'Twice as Good' & Ratio Cases

    Common slip: Reading 'twice as efficient' as twice the days.

    Instead: Efficiency up means days down β€” half the days, not double.

  • Pipes & Cisterns

    Common slip: Adding the emptying pipe's speed as if it fills the tank.

    Instead: Put a minus sign in front of every outlet or leak before adding.

  • Men–Days–Hours Chain & Provisions

    Common slip: Writing more men on the wrong side (more men, more days).

    Instead: For a fixed job men and days are inverse: M₁D₁ = Mβ‚‚Dβ‚‚.

  • Joining / Leaving Mid-work, Alternate Days & Wages

    Common slip: Splitting wages by days alone when efficiencies differ.

    Instead: Wages follow work done: rate Γ— days for each person.

  • Work Rates & the LCM Method

    Common slip: For three workers, applying ab/(a+b) to a pair and merging again.

    Instead: Add all three rates in one line, or use abc/(ab+bc+ca).

4 sample questions with full solutions

A cross-section of the set, from easier to harder and from different subtopics. Try each one before reading the solution; the interactive test above gives you the rest.

Sample 1easyJoining / Leaving Mid-work, Alternate Days & WagesB joins after t days40s exam budget

A can complete a work in 20 days and B in 15 days. A works alone for 5 days, after which B joins him. In how many days in total is the work completed?

  1. A.

    103710\frac{3}{7} days

  2. B.

    12 days

  3. C.

    113711\frac{3}{7} days

  4. D.

    111211\frac{1}{2} days

Correct answer: option C

113711\frac{3}{7} days

Step-by-step solution

A alone did 520=14\frac{5}{20} = \frac14. Remaining 34\frac34 at 760\frac{7}{60}/day β†’ 457=637\frac{45}{7} = 6\frac37 days. Total =5+637=1137= 5 + 6\frac37 = 11\frac37 days.

Sample 2mediumWork Rates & the LCM MethodPairwise combination times45s exam budget

A and B together can do a piece of work in 10 days, B and C together in 12 days, and A and C together in 15 days. All three working together will finish it in:

  1. A.

    8 days

  2. B.

    6 days

  3. C.

    9 days

  4. D.

    10 days

Correct answer: option A

8 days

Step-by-step solution

Sum of pair rates =110+112+115=6+5+460=14= \frac{1}{10} + \frac{1}{12} + \frac{1}{15} = \frac{6+5+4}{60} = \frac{1}{4}. Trio rate =12Γ—14=18= \frac{1}{2} \times \frac{1}{4} = \frac{1}{8} β†’ 8 days.

Sample 3mediumEfficiency, 'Twice as Good' & Ratio CasesEfficiency ratio plus a gap of days45s exam budget

A works 1.5 times as fast as B (efficiencies 3 : 2). Together they finish a job in 20 days. B alone will finish it in:

  1. A.

    331333\frac{1}{3} days

  2. B.

    30 days

  3. C.

    50 days

  4. D.

    60 days

Correct answer: option C

50 days

Step-by-step solution

Together rate =5u=120= 5u = \frac{1}{20} β†’ u=1100u = \frac{1}{100}. B's rate =2u=150= 2u = \frac{1}{50} β†’ 50 days.

Sample 4hardMen–Days–Hours Chain & Provisionsreinforcement50s exam budget

45 men would complete a piece of work in 16 days. They work for 4 days, after which 36 more men join them. The remaining work is now completed in:

  1. A.

    5135\frac{1}{3} days

  2. B.

    6236\frac{2}{3} days

  3. C.

    7137\frac{1}{3} days

  4. D.

    8 days

Correct answer: option B

6236\frac{2}{3} days

Step-by-step solution

Total work =720= 720 man-days; done in 4 days =180= 180. Remaining =540= 540 with 81 men β‡’ 54081=623\frac{540}{81} = 6\frac{2}{3} days.

Exam shortcut

540 man-days Γ· 81 men = 6β…” days.

How to practise Time & Work

  1. Learn the method first. Start with Work Rates & the LCM Method and work through the 5 subtopics in order; keep the 22-formula sheet open the first time.
  2. Go subtopic by subtopic in practice mode. The largest block is Efficiency, 'Twice as Good' & Ratio Cases (13 questions); start there, because it carries the most weight in this set. Before calculating, write the set-up in one line: what the base or unknown is, what is asked, and which formula or table fraction applies. Calculate only after that, and finish by checking whether the size of the answer is sensible.
  3. Then take the full set as a timed test. Allow 40 minutes and do not pause. Afterwards compare your time with the target for each question: a correct answer that took three times the budget is still a weak spot.
  4. Review the misses, then repeat after a gap. For every wrong answer, redo the question from a blank page and note whether the slip was in reading, in the set-up, or in arithmetic. The three need different fixes. When you are logged in, wrong answers are saved to My revision so you can retry them later; use the revision planner to schedule the repeat.

Stuck before you start? Read the 5 solved examples first; they are worked line by line.